Gas-fired boiler plant alteration project

Supply and installation of three 8.4 MW gas-fired boilers together with gas, electrical and IAC systems and adaptation of the fire water tank in the Świecie district heating plant building.  Project timeline: 2022

Image
Pracownik

The project was completed for Veolia Północ Sp. z o.o. The energy generated by the new plant in Świecie is supplied to 2 housing estates in the town, at ul. Sobieskiego and ul. Łokietka.   

Veolia Group units have been investing in their decarbonisation strategy for years,focusing on the gradual replecement of coal use and ultimately, reduce C02 emissions.

As a general contractor, CDC carriers out projects for Veolia Group businesses, providing consultancy, design engineering, construction and commissioning of plants. 