Completed projects
Gas boiler and cogeneration plant construction project
Construction of a gas-fired boiler plant with its building and utilities.
Construction of appurtenant infrastructure for a container-sheltered gas-fired CHP system with an electrical output of 0.999 MW.
Project timeline: 2021 to 2023
Image
The project was constructed at the heating plant in Lidzbark Warmiński, owned by Veolia Północ Sp. z o.o. A 2.8 MW gas-fired boiler plant and infrastructure for a high-efficiency, low-carbon gas-fired cogeneration system with a capacity of nearly 1 MW were commissioned.
The project objective was to reduce coal use and CO2 emissions. The use of low-carbon gas fuel and the optimisation of the energy and heat generation process is part of the decarbonisation project being implemented by the Veolia Group.
Gas boiler and cogeneration plant construction project (Lidzbark Warmiński)
Gas boiler and cogeneration plant construction project (Lidzbark Warmiński)
Gas boiler and cogeneration plant construction project (Lidzbark Warmiński)
Gas boiler and cogeneration plant construction project (Lidzbark Warmiński)
Gas boiler and cogeneration plant construction project (Lidzbark Warmiński)